Commercial utility bill analysis — demand, ratchets and tariff reconciliation
Savings
Grid
Incentives
Equipment
Plans
Account
Bill analysis
Multi-site
Demand exposure
Analyze a bill
Upload the PDF your utility issued
We identify the utility and rate schedule, read the figures, and analyze it. Everything stays editable below.
Upload and analyze
The bill
Utility
AEP Texas Inc.
CenterPoint Energy Houston Electric
unknown
Nevada Power Company d/b/a NV Energy
Oncor Electric Delivery Company LLC
Pacific Gas and Electric Company
Southern California Edison
San Diego Gas & Electric
Texas-New Mexico Power Company
Rate schedule
GS — General Service
LGS-1 — Large General Service 1
OLGS-1-TOU — Optional Large General Service 1 - Time of Use
LGS-2 — Large General Service 2
LGS-3 — Large General Service 3
OLGS-3P-HLF — Optional LGS-3 Primary - High Load Factor
RS — Residential Service
RS-TOU — Residential Time-of-Use
Service voltage
Secondary
Primary
Transmission
Period start
Period end
Total printed on the bill
Drives reconciliation. Worth entering.
Usage and demand
Total kWh
On-peak kWh
Off-peak kWh
Mid-peak kWh
Three-period TOU only.
Billed demand (kW)
On-peak demand (kW)
kvarh
For power-factor charges.
History and riders
Prior demands, one per line
2025-08 = 880 2025-09 = 705 2025-10 = 480 2026-05 = 505 2026-06 = 612
Sets the ratchet floor. Without it, ratcheted charges cannot be modeled.
Riders and other line items
DEAA rider = 1485.00 TRED rider = 50.00 REPR rider = -130.00 Energy efficiency charge = 387.50 NDPP rider = 447.50 ESAP rider = 17.50 Franchise fee = 1463.00
Copied off the bill. Needed for the totals to reconcile.
Analyze this bill